Eight major precautions for door and window installation and construction

[China Glass Net] Before installation, check the shape and position accuracy of the door and window openings, check whether the number and position of the embedded rafts meet the design requirements, and whether the high-rise windows are connected to the lightning protection belt according to the regulations. Supervise the construction unit to rectify.

Line positioning

(1) According to the installation position, size and elevation of the doors and windows in the design drawings (the term "elevation" is provided by the industry encyclopedia), the door and window edge lines are measured according to the center line of the door and window. If it is a multi-storey or high-rise building (the term "high-rise building" is provided by the industry encyclopedia), the edge of the top and bottom windows and doors shall prevail, and the edge of the door and window shall be led by a line pendant or theodolite, and shall be marked at each door window. For individual not straight mouths should be handled.

(2) The horizontal position of the doors and windows should be based on the horizontal line of the floor indoor +1250px, and the height of the window should be measured upwards. The bullet line (the term "elastic line" is provided by the industry encyclopedia) is straight. Each layer must maintain the same height of the window.

2. Aluminum window draping installation

Fix the draping on the aluminum alloy window according to the requirements of the construction drawings, and ensure that the position is correct and the installation is firm.

3. Anti-corrosion treatment

(1) When the anti-corrosion treatment design of the outer surface of the door and window frame is required, it shall be treated according to the design requirements. If the design does not require it, it can be coated with anti-corrosion coating or plastic film to protect the cement mortar from direct contact with the surface of the aluminum alloy door and window, resulting in electrochemical reaction and corrosion of aluminum alloy doors and windows.

(2) Installation of aluminum (the term "aluminum" is provided by the industry encyclopedia) alloy (entry "alloy" provided by the industry encyclopedia) doors and windows, if the use of connecting iron parts to fix, then connect iron parts, fixing parts, etc. Metal parts are preferably made of stainless steel. Otherwise, anti-corrosion treatment must be carried out to avoid electrochemical reaction and corrosion of aluminum alloy doors and windows.

4. The installation of aluminum alloy doors and windows is in place

Install the aluminum alloy door and window frame according to the planned door and window positioning line. And timely adjust the horizontal, vertical and diagonal length of the door and window frame to meet the quality standards, and then temporarily fixed with wooden wedges.

5. Fixation of aluminum alloy doors and windows

(1) When the iron parts are pre-buried on the wall, the iron feet of the aluminum alloy doors and windows can be directly welded directly to the pre-embedded iron parts on the wall, and the welding place needs to be rust-proofed.

(2) When there is no embedded iron on the wall, the iron feet of the aluminum alloy doors and windows can be fixed to the wall by metal expansion bolts or plastic expansion bolts.

(3) When there is no embedded iron on the wall, you can use the electric drill to make a hole with a depth of 80mm and a diameter of 6mm on the wall, and use L-shaped 80mm × 50mm 6rmn steel. Apply 108 cement slurry to the long end and punch into the hole. After the 108 cement slurry is finally set, the iron feet of the aluminum alloy doors and windows are welded to the embedded 6 mm steel bars.

6. Treatment between the gap between the door and window frame and the wall

(1) After the aluminum alloy doors and windows are installed and fixed, the concealed project acceptance should be carried out first. After passing the test, the gap between the door and window frame and the wall should be handled in time according to the design requirements.

(2) If the design is not required, the elastic insulation material or glass wool felt (the term "glass wool felt" is provided by the industry encyclopedia) can be used to fill the gap layer by layer, and the outer surface is left with 5~8mm deep groove filling and embedding. Ointment or sealant.

7. Door and window sash and door and window glass installation

1) Door and window sash and door and window glass shall be installed after the decoration of the wall surface of the opening.

2) Sliding door (the term "sliding door" is provided by the industry encyclopedia) After the window and the window frame are fixed and fixed, the glass door sash is placed into the frame slide, and the gap between the frame and the fan can be adjusted.

3) Open the doors and windows in the frame and the fan frame to assemble the wall, install and fix the glass, then adjust the gap between the frame and the fan first, then adjust the position of the glass and adjust the position. Finally, insert the sealing strip and fill it. Sealant.

4) The floor spring door should be installed and fixed after the door frame and the ground spring main body are installed in the ground. First insert the glass into the door frame and place the frame together, adjust the gap of the frame fan, and finally fill in the sealing strip and sealant of the door leaf glass.

8. Construction precautions

1) Pay attention to the quality of assembling when using multiple sets of aluminum alloy doors and windows. The head should be flat and not ridged.

2) During the construction, the product protection must be strictly carried out, and the protective adhesive tape and film that have been damaged and damaged should be repaired in time to remove the dirt and stains splashed on the surface of the door and window in time to avoid contamination of the aluminum alloy door and window.

3) The thickness of the door and window glass and the size of the fan-shaped inlay groove and the sealing strip should conform to the national standards and design requirements. When installing the sealing strip, there should be room for expansion and contraction to prevent the sealing strip from falling off.

Hotel Slipper

Product name hotel slipper,
Material/ filling terry towel, coral fleece, velour, waffle fabric, netting fabric, non-woven fabric and so on,
Color/printing red,green,blue,grey,white and other color,customized.
Size:26*10.5cm,28*10.5cm,29*10.5cm,29.5*11cm,30*11cm.
Logo off-set imprinted,embroidery,hot trans-printing and as your request.
Use in hotel and bedroom.
style open toe and closed toe,women and men.
MOQ 5000PCS
Sample Charge Free freight collection.
Sample Time After confirmed all the details, the sample is 5-7days
Packing Details 1pcs/opp bag,100pcs/ctns
Delivery Details 25-30 days
Payment Item TT,L/C
Loading Port Ningbo and Shanghai

Hotel Slippers,Customized Hotel Slipper,Personalized Hotel Slippers,Hotel Velour Slipper

Yangzhou Lansun Slipper Co.,Ltd , https://www.lansunslippers.com